Análise integral de uma estação coletora e compressora de óleo e gás: sistema de combate a incêndio, processo produtivo e auditoria de barreiras
| dc.contributor.advisor | Rios, Rafael Barbosa | |
| dc.contributor.author | Silva, Rútilo Pereira | |
| dc.contributor.referee1 | Rios, Rafael Barbosa | |
| dc.contributor.referee2 | Nóbrega, Geraldine Angélica Silva da | |
| dc.contributor.referee3 | Melo, Mayara Ricelly de Oliveira Leite de | |
| dc.coverage.spatial | Mossoró | |
| dc.date.accessioned | 2024-07-24T20:58:03Z | |
| dc.date.available | 2024-07-24T20:58:03Z | |
| dc.date.issued | 2024-03-20 | |
| dc.description.abstract | A segurança de processo, atualmente alicerçada no Gerenciamento da Integridade Estrutural (SGI), um dos regulamentos técnicos da Agência Nacional do Petróleo, Gás Natural e Biocombustíveis (ANP), tem por finalidade garantir a continuidade, com segurança, das operações que ocorrem nas instalações exploratórias de petróleo e gás natural onshore. A ANP aborda alguns sistemas críticos que devem possuir plano de manutenção, funcionalidade e integridade em conformidade com os seus requisitos e diretrizes. O objetivo deste trabalho é avaliar a eficiência do Sistema de Combate a Incêndio (SCI) de uma Estação Coletora e Compressora de Óleo e Gás, bem como esclarecer o seu processo produtivo e aplicar as técnicas de auditoria de barreiras (AB) voltadas ao SCI. A implementação da AB visa verificar a conformidade dos equipamentos críticos, pertencentes a lista de elementos críticos (LEC), com os requisitos de integridade e plano de manutenção estabelecidos. Os cálculos para o SCI foram divididos em três etapas específicas: determinação da vazão para os possíveis cenários de sinistro, cálculo da pressão de descarga do consumidor mais desfavorável, e estimativa da pressão de recalque dos aplicadores de espuma. Dessa forma, o hidrante mais desfavorável apresentou pressão de recalque de 11,10 kgf/cm² e vazão de 1800 L/min, enquanto a câmara de espuma detinha pressão de 7,79 kgf/cm² e necessitava de uma vazão igual a 195,91 L/min. De acordo com a Instrução Técnica 22/2018 do Corpo de Bombeiros Militar do Estado do Rio Grande do Norte (CBMRN), esses valores estão dentro dos limites aceitáveis para a continuidade da operação, já que os requisitos mínimos de pressão para operação do hidrante e da câmara de espuma são de 6 kgf/cm², enquanto que para a vazão são de 600 L/min e 200 L/min, respectivamente. Por fim, foi constatado, por meio da auditoria de barreiras, que os elementos críticos do SCI estavam funcionais, com poucos desvios identificados, principalmente em relação aos hidrantes. | |
| dc.description.abstract2 | Process safety, currently grounded in Structural Integrity Management (SGI), one of the technical regulations of the National Agency of Petroleum, Natural Gas and Biofuels (ANP), aims to ensure the safe continuity of operations occurring in onshore oil and natural gas exploration facilities. ANP addresses some critical systems that must have maintenance plans, functionality, and integrity in accordance with its requirements and guidelines. The objective of this study is to evaluate the efficiency of the Fire Fighting System (FFS) of an Oil and Gas Collecting and Compressing Station, as well as to elucidate its production process and apply barrier audit (BA) techniques focused on the FFS. The implementation of BA aims to verify the compliance of critical equipment, belonging to the list of critical elements (LEC), with the established integrity and maintenance plan requirements. Calculations for the FFS were divided into three specific stages: determining the flow rate for potential disaster scenarios, calculating the discharge pressure of the most unfavorable consumer, and estimating the foam applicators' discharge pressure. Thus, the most unfavorable hydrant presented a discharge pressure of 11.10 kgf/cm² and a flow rate of 1800 L/min, while the foam chamber had a pressure of 7.79 kgf/cm² and required a flow rate of 195.91 L/min. According to Technical Instruction 22/2018 of the Military Fire Brigade of the State of Rio Grande do Norte (CBMRN), these values are within acceptable limits for operation continuity, as the minimum pressure requirements for hydrant and foam chamber operation are 6 kgf/cm², while for flow rates are 600 L/min and 200 L/min, respectively. Finally, it was found through barrier audit that the critical elements of the FFS were functional, with few identified deviations, mainly in relation to hydrants. | |
| dc.description.physical | 82 f. | |
| dc.format.mimetype | ||
| dc.identifier.bibliographicCitation | SILVA, Rútilo Pereira. Análise integral de uma estação coletora e compressora de óleo e gás: sistema de combate a incêndio, processo produtivo e auditoria de barreiras. 2024. 82 f. TCC (Graduação) - Curso de Engenharia Química, Centro de Engenharias - CE, Universidade Federal Rural do Semi-Árido - UFERSA, Mossoró/RN, 2024. | |
| dc.identifier.uri | https://repositorio.ufersa.edu.br/handle/prefix/10999 | |
| dc.language.iso | pt_BR | |
| dc.publisher.center | Centro de Engenharias - CE | |
| dc.publisher.country | Brasil | |
| dc.publisher.initials | UFERSA | |
| dc.publisher.institution | Universidade Federal Rural do Semi-Árido | |
| dc.rights | info:eu-repo/semantics/openAccess | en |
| dc.rights.holder | UFERSA | |
| dc.rights.uri | http://creativecommons.org/licenses/by/3.0/br/ | |
| dc.subject.cnpq | ENGENHARIAS::ENGENHARIA QUIMICA | |
| dc.subject.keyword | Auditoria de barreiras | |
| dc.subject.keyword | Petróleo | |
| dc.subject.keyword | Pressão de descarga | |
| dc.subject.keyword | Segurança de processo | |
| dc.subject.keyword | Sistema de combate a incêndio | |
| dc.subject.keyword | Estação coletora e compressora de óleo e gás | |
| dc.title | Análise integral de uma estação coletora e compressora de óleo e gás: sistema de combate a incêndio, processo produtivo e auditoria de barreiras | |
| dc.type | info:eu-repo/semantics/bachelorThesis |
