🚨 Informamos aos concluintes que após a validação do orientador no sistema, A BIBLIOTECA PRECISA DE 7 DIAS ÚTEIS para tratar e processar os dados. Por isso, NÃO DEIXE PARA ENVIAR O TCC (graduação ou pós-graduação) DE ÚLTIMA HORA. Dúvidas: repositorio@ufersa.edu.br🚨

Elaboração do programa de gerenciamento de riscos – PGR na pedreira de Caraúbas/RN

dc.contributor.advisorDantas, Rejane Ramos
dc.contributor.authorRodrigues, Vitória Maria Aquino
dc.contributor.referee1Dantas, Rejane Ramos
dc.contributor.referee2Crisóstomo, Daniel Carlos de Carvalho
dc.contributor.referee3Maia, Geovanna Paulina Dantas
dc.coverage.spatialCaraúbas
dc.date.accessioned2024-05-20T17:56:57Z
dc.date.available2024-05-20T17:56:57Z
dc.date.issued2024-04-18
dc.description.abstractA área de Segurança do Trabalho (ST) tem experimentado um crescimento significativo com a evolução das indústrias. É visto que com o avanço industrial, tornou-se crucial adotar medidas de segurança para eliminar ou reduzir o número de acidentes de trabalho que ocorrem devido à sua ausência. Com isso, no ano de 1978 foram aprovadas Normas Regulamentadoras - NRs com a finalidade de estabelecer medidas de segurança a serem tomadas no ambiente de trabalho para garantir um local seguro que proporcionasse aos colaboradores saúde e bem-estar. O objetivo deste trabalho é elaborar o Programa de Gerenciamento de Riscos – PGR, a qual é umas das ferramentas regulamentadas pela NR–01 (Disposições gerais e gerenciamento de riscos ocupacionais), que tem o objetivo de detectar perigos e possíveis riscos antes que algum acidente aconteça, garantindo maior segurança aos colaboradores da empresa. Um empreendimento do tipo pedreira se encaixa dentro dos parâmetros para a realização de um PGR, tendo em vista que a mesma possui Grau de Risco 4. Com isso, o programa foi realizado com o auxílio de dois documentos: o inventário de riscos e o plano de ação, com a finalidade de eliminar os riscos existentes dentro do empreendimento através de medidas de segurança dispostas nas Normas Regulamentadoras aplicáveis. Com as avaliações realizadas foram observadas algumas falhas de segurança de acordo com o que discorre nas normas como a não utilização de EPIs, mobília antiga e com defeitos, não utilização de medidas de segurança, entre outros. Diante dessas avaliações foi identificado que além de ser um empreendimento de alto risco devido o tipo de atividade, torna-se mais perigoso por causa das falhas de segurança e com isso, o PGR traz medidas a serem tomadas para eliminar muitos desses riscos.
dc.description.abstract2Occupational Safety (ST) is a sector that has increased increasingly with the evolution of industries, as with industrial advancement there has arisen the need to take safety measures to penalize the number of workplace accidents recorded due to their absence. As a result, in 1978 the Regulatory Standards - NRs were established with the purpose of establishing safety measures to be taken in the work environment to guarantee a safe place that provides employees with health and well-being. The Risk Management Program – PGR is one of the tools regulated by NR–01 (General provisions and occupational risk management) which aims to detect dangers and possible risks before an accident occurs, ensuring greater safety for the company's employees. A quarry-type enterprise fits within the parameters for carrying out a PGR considering that it has Risk Level 4, therefore, the program was carried out with the help of two documents, which are the risk inventory and the plan of action with the purpose of eliminating existing risks within the enterprise through security measures set out in the applicable Regulatory Standards. With the assessments carried out, some safety flaws were observed in accordance with the rules, such as the non-use of PPEs, old and defective furniture, non-use of safety measures and others. In view of these assessments, it was identified that in addition to being a high-risk enterprise due to the type of activity, it becomes more dangerous due to security flaws and with this, the PGR brings measures to be taken to eliminate many of these risks.
dc.description.physical51 f.
dc.format.mimetypepdf
dc.identifier.bibliographicCitationRODRIGUES, Vitória Maria Aquino. Elaboração do programa de gerenciamento de riscos – PGR na pedreira de Caraúbas/RN. 2024. 51 f. TCC (Graduação) - Curso de Interdisciplinar em Ciência e Tecnologia, Universidade Federal Rural do Semi-Árido, Caraúbas, 2024.
dc.identifier.urihttps://repositorio.ufersa.edu.br/handle/prefix/10850
dc.language.isopt_BR
dc.publisher.centerCentro Multidisciplinar de Caraúbas - CMC
dc.publisher.countryBrasil
dc.publisher.initialsUFERSA
dc.publisher.institutionUniversidade Federal Rural do Semi-Árido
dc.rights.holderUFERSA
dc.subject.cnpqCIENCIAS EXATAS E DA TERRA::CIENCIA E TECNOLOGIA
dc.subject.keywordRiscos
dc.subject.keywordPerigos
dc.subject.keywordPedreira
dc.titleElaboração do programa de gerenciamento de riscos – PGR na pedreira de Caraúbas/RN
dc.typeinfo:eu-repo/semantics/bachelorThesis

Arquivos

Pacote original

Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
VitóriaMAR_MONO.pdf
Tamanho:
880,79 KB
Formato:
Adobe Portable Document Format

Licença do pacote

Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
license.txt
Tamanho:
1,58 KB
Formato:
Item-specific license agreed upon to submission
Descrição: