Gestão de processo de negócio na construção civil: um estudo da implementação do steel frame em obras de blocos escolares no município de Fortaleza-CE

dc.contributor.advisorSerafim, Nayara Katryne Pinheiro
dc.contributor.authorSantos, Franciberny Sávio de Souza
dc.contributor.coadvisorHenriques, Glauco Fonsêca
dc.contributor.referee1Marinho, Renata de Oliveira
dc.contributor.referee2Junior, Gilvan Bezerra dos Santos
dc.coverage.spatialCaraúbas
dc.date.accessioned2025-01-27T13:49:06Z
dc.date.available2025-01-27T13:49:06Z
dc.date.issued2024-10-25
dc.description.abstractDevido à crescente competitividade no mercado atual da construção civil, as empresas buscam estratégias de negócio para se destacarem e se manterem ativas no setor. Eles precisam investir em inovação, priorizando a qualidade do serviço, o custo e o prazo de execução, além da responsabilidade com o meio ambiente. Assim, o presente trabalho é voltado para o uso de uma nova metodologia construtiva no ramo da construção civil, sendo essa metodologia o Steel Frame, tendo a sua implementação em obras escolares no município de Fortaleza como objeto de estudo. O trabalho realizou uma avaliação comparativa entre duas edificações construídas por métodos diferentes: uma com a forma convencional de alvenaria de bloco cerâmico e concreto armado e a outra em modo Steel Frame. No qual foram avaliados todos os seus processos de gerenciamento, aquisição de mão de obra, material, logística e financeiro. O trabalho foi realizado com os dados de uma empresa lotada na cidade de Fortaleza, que atua no ramo da construção civil, como também, está realizando o processo de implementação da metodologia Light Steel Frame (LSF). Portanto, é através dessa empresa que foram efetuadas coletas de dados, por meio de entrevistas, buscando entender os processos que motivaram a implementar essa prática e compreender seu processo de negócio. Além disso, respeito da aquisição de dados, foram elaboradas planilhas orçamentárias com base nos dados das disponibilizadas em edital para a construção de blocos no IFCE, possibilitando o entendimento dos serviços, custos, mão de obra, material e cronograma de execução. Com a organização temática dos dados e após comparativos e inferências, podemos concluir, que os dois métodos construtivos possuem especificidades, e a sua escolha deve ser fundamentada na opção de cliente, em relação ao tempo de execução steel frame possuem um tempo de execução médio duas vezes menor que o método de alvenaria. No entanto, se o parâmetro prioritário é o custo, as obras em alvenaria possuem um custo menor, mesmo com o acréscimo de um tempo maior de execução. Portanto, a metodologia adequada para uso, irá depender das demandas levantadas pelo cliente, e cada método desempenha um resultado melhor em alguns parâmetros de custo, tempo e mão de obra, que devem ser avaliados para uma decisão adequada para os anseios do cliente.
dc.description.abstract2Due to the increasing competitiveness in the current construction market, companies are seeking business strategies to stand out and remain active in the sector. They need to invest in innovation, prioritizing service quality, cost, and execution time, as well as responsibility towards the environment. Thus, the present work focuses on the use of a new construction methodology in the civil construction field, specifically the Steel Frame method, with its implementation in school buildings in the municipality of Fortaleza as the object of study. The work conducted a comparative evaluation between two buildings constructed using different methods: one with the conventional form of ceramic block masonry and reinforced concrete, and the other using Steel Frame. All processes of management, labor acquisition, materials, logistics, and finances were evaluated. The study was carried out using data from a company based in Fortaleza that operates in the civil construction sector and is also in the process of implementing the Light Steel Frame (LSF) methodology. Data collection was conducted through interviews to understand the processes that motivated the implementation of this practice and to comprehend its business process. Additionally, regarding data acquisition, budget spreadsheets were developed based on the data provided in the public notice for the construction of blocks at IFCE, enabling an understanding of services, costs, labor, materials, and execution timelines. With the thematic organization of the data and after comparisons and inferences, we can conclude that both construction methods have specificities, and their choice should be based on the client's preferences. In terms of execution time, Steel Frame has an average execution time that is two times shorter than the masonry method. However, if the priority parameter is cost, masonry works have a lower cost, even with the longer execution time. Therefore, the appropriate methodology for use will depend on the demands raised by the client, and each method performs better in some parameters of cost, time, and labor, which should be evaluated for an adequate decision that meets the client’s needs.
dc.description.physical73 f.
dc.format.mimetypepdf
dc.identifier.bibliographicCitationSANTOS, Franciberny Sávio de Souza. Gestão de processo de negócio na construção civil: um estudo da implementação do steel frame em obras de blocos escolares no município de Fortaleza-CE. 2024. 73 f. TCC (Graduação) - Curso de Engenharia Civil, Centro Multidisciplinar de Caraúbas, Universidade Federal Rural do Semi-Árido, Caraúbas, Rn, 2024.
dc.identifier.urihttps://repositorio.ufersa.edu.br/handle/prefix/12307
dc.language.isopt_BR
dc.publisher.centerCentro Multidisciplinar de Caraúbas - CMC
dc.publisher.countryBrasil
dc.publisher.initialsUfersa
dc.publisher.institutionUniversidade Federal Rural do Semi-Árido
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rights.holderUFERSA
dc.rights.licenseAttribution-ShareAlike 3.0 Brazilen
dc.rights.urihttp://creativecommons.org/licenses/by-sa/3.0/br/
dc.subject.cnpqENGENHARIAS::ENGENHARIA CIVIL
dc.subject.keywordAlvenaria.
dc.subject.keywordSteel frame.
dc.subject.keywordBlocos escolares.
dc.subject.keywordProcesso de negócio.
dc.subject.keywordTécnicas construtivas.
dc.titleGestão de processo de negócio na construção civil: um estudo da implementação do steel frame em obras de blocos escolares no município de Fortaleza-CE
dc.typeinfo:eu-repo/semantics/bachelorThesis

Arquivos

Pacote original

Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
FrancibernySSS_MONO.pdf
Tamanho:
1,47 MB
Formato:
Adobe Portable Document Format

Licença do pacote

Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
license.txt
Tamanho:
1,58 KB
Formato:
Item-specific license agreed upon to submission
Descrição: