🚨 Informamos aos concluintes que após a validação do orientador no sistema, A BIBLIOTECA PRECISA DE 7 DIAS ÚTEIS para tratar e processar os dados. Por isso, NÃO DEIXE PARA ENVIAR O TCC (graduação ou pós-graduação) DE ÚLTIMA HORA. Dúvidas: repositorio@ufersa.edu.br🚨

Experiência na implementação do sistema de gerenciamento de integridade de poços no polo Riacho da Forquilha-RN

Loading...
Thumbnail Image

Journal Title

Journal ISSN

Volume Title

Publisher

Abstract

The purpose of this repor tis to describe the activities developed during a supervised internship in the reservoir engineering sector at Potiguar E&P, between the periods of March and October 2021, regarding the preparation of a well delivery document (Well Handover) of the wells belonging to the Riacho da Forquilha hub in Rio Grande do Norte, in compliance with the guidelines of Resolution 46/2016 of the National Petroleum Agency – ANP, that instituted the SGIP. The concept of integrity of wells, the elements that make up the solidary set of barriers (CSB) and integrity verification parameters of these elements are presented, as well as analyzing the relationship of contentes acquired during graduation with the internship work proposal.



Description

Citation

Endorsement

Review

Supplemented By

Referenced By