🚨 Informamos aos concluintes que após a validação do orientador no sistema, A BIBLIOTECA PRECISA DE 7 DIAS ÚTEIS para tratar e processar os dados. Por isso, NÃO DEIXE PARA ENVIAR O TCC (graduação ou pós-graduação) DE ÚLTIMA HORA. Dúvidas: repositorio@ufersa.edu.br🚨

Proposta de planejamento de uma obra de reforma

dc.contributor.advisorSousa, Adla Kellen Dionísio
dc.contributor.advisormailadla.sousa@ufersa.edu.br
dc.contributor.authorAugusto, Isaac Ravanelle Lima
dc.contributor.referee1Sousa, Adla Kellen Dionísio
dc.contributor.referee2Bobô, Hyan Esley Martins
dc.contributor.referee3Nunes, Francisco Iuri Aires
dc.coverage.spatialPau dos Ferros
dc.date.accessioned2025-03-28T16:46:07Z
dc.date.available2025-03-28T16:46:07Z
dc.date.issued2025-03-18
dc.description.abstractO planejamento para execução de uma obra é uma etapa essencial, pois permite organizar e priorizar atividades, acompanhar o progresso da obra e intervir diante de problemas e erros. O objetivo deste trabalho foi elaborar o planejamento de uma obra de reforma a partir de um orçamento já realizado. Para isso seguiu-se os seguintes passos: Identificação das atividades, Identificação dos recursos, Definição das durações, Definição das precedências e a Geração do cronograma. Os resultados mostram que as atividades que estão no caminho crítico, ou seja, atividades que não podem atrasar, pois isso atrasaria o prazo de entrega da obra, foram: Placa de obra, Demolição de revestimento cerâmico, Impermeabilização de alicerce e viga baldrame, Impermeabilização de paredes, Aplicação e lixamento de massa látex em paredes, Aplicação manual de pintura com tinta látex acrílico em paredes e por último Limpeza final da obra. A atividade com maior tempo de duração foi a Aplicação manual de pintura com tinta látex acrílico em paredes. A atividade com mais folga, ou seja, que pode atrasar sem prejudicar o prazo de entrega da obra foi a Luminária Painel Led embutir. Diante disso, conclui-se sobre a importância do planejamento aliado ao orçamento de obras, ficando mais evidente com a precisão em que as atividades podem ser gerenciadas após obtenção do cronograma.
dc.description.abstract2Planning for the execution of a construction project is an essential step, as it allows for the organization and prioritization of activities, monitoring of progress, and intervention in the face of problems and errors. The objective of this work was to develop the planning for a renovation project based on an already prepared budget. The following steps were followed: Identification of activities, Identification of resources, Definition of durations, Definition of precedences, and Generation of the schedule. The results show that the activities on the critical path, i.e., activities that cannot be delayed as they would delay the project's delivery, were Construction signboard, Demolition of ceramic coating, Waterproofing of foundation and beam, Waterproofing of walls, Application and sanding of latex putty on walls, Manual application of acrylic latex paint on walls, and finally, Final cleaning of the project. The activity with the longest duration was the Manual application of acrylic latex paint on walls. The activity with the most slack, meaning it can be delayed without affecting the project's delivery deadline, was the Installation of recessed LED panel lighting. Therefore, it is concluded that the importance of planning combined with construction budgeting becomes more evident with the precision in which activities can be managed after obtaining the schedule.
dc.description.physical47 f.
dc.format.mimetypepdf
dc.identifier.bibliographicCitationAUGUSTO, Isaac Ravanelle Lima. Proposta de planejamento de uma obra de reforma. 2024. 47f. Monografia (Bacharelado em Engenharia Civil) - Centro Multidisciplinar de Pau dos Ferros, Universidade Federal Rural do Semi-Árido, Pau dos Ferros, 2024.
dc.identifier.urihttps://repositorio.ufersa.edu.br/handle/prefix/12772
dc.language.isopt_BR
dc.publisher.centerCentro Multidisciplinar de Pau dos Ferros - CMPF
dc.publisher.countryBrasil
dc.publisher.departmentDepartamento de Engenharias e Tecnologia
dc.publisher.initialsUFERSA
dc.publisher.institutionUniversidade Federal Rural do Semi-Árido
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rights.holderUFERSA
dc.rights.licenseAttribution-ShareAlike 3.0 Brazilen
dc.rights.urihttp://creativecommons.org/licenses/by-sa/3.0/br/
dc.subject.cnpqENGENHARIAS::ENGENHARIA CIVIL
dc.subject.keywordPlanejamento de obra
dc.subject.keywordOrçamento de obra
dc.subject.keywordCronograma de obra
dc.subject.keywordDiagrama de Gantt
dc.subject.keywordReforma de construção civil
dc.subject.keywordConstruction planning
dc.subject.keywordConstruction budget
dc.subject.keywordConstruction schedule
dc.subject.keywordGantt chart
dc.subject.keywordCivil construction reform
dc.titleProposta de planejamento de uma obra de reforma
dc.title.alternativePlanning proposal for a renovation project
dc.typeinfo:eu-repo/semantics/bachelorThesis

Arquivos

Pacote original

Agora exibindo 1 - 2 de 2
Carregando...
Imagem de Miniatura
Nome:
IsaacRLA_MONO.pdf
Tamanho:
4,26 MB
Formato:
Adobe Portable Document Format
Carregando...
Imagem de Miniatura
Nome:
Carta_de_anuencia_-_Isaac_Ravanelle_Lima_Augusto.pdf
Tamanho:
52,87 KB
Formato:
Adobe Portable Document Format

Licença do pacote

Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
license.txt
Tamanho:
1,58 KB
Formato:
Item-specific license agreed upon to submission
Descrição: