Comparação entre o planejado e executado nas etapas iniciais de uma obra

dc.contributor.advisorOliveira, Adla Kellen Dionísio Sousa de
dc.contributor.authorDURAND FILHO , Cleto Rodrigues
dc.contributor.referee1Oliveira, Adla Kellen Dionísio Sousa de
dc.contributor.referee2Bandeira , Rafaely Angelica Fonseca
dc.contributor.referee3Bomediano , Karen Sorgi
dc.coverage.spatialPau dos Ferros
dc.date.accessioned2024-10-11T18:32:20Z
dc.date.available2024-10-11T18:32:20Z
dc.date.issued2021-06-01
dc.description.abstractNeste trabalho comparou-se, para uma residência unifamiliar de alto padrão, o tempo de duração planejado para as atividades com o tempo de execução da obra. Essa comparação foi realizada nas etapas iniciais da obra: serviços preliminares e infraestrutura. Para isso utilizou-se o software Microsoft Ms-Project onde foi elaborada a Estrutura Analítica de Projeto (EAP), e realizada a estimativa das durações para cada atividade. Simultaneamente foi elaborado por meio do software o gráfico de Gantt, tornando possivel a visualização do início e fim de cada atividade. Além disso, foi realizado a coleta da duração das atividades in loco para a comparação com o planejado e para acervo futuro da empresa. No planejamento foi estimado o tempo de duração para cada etapa, sendo 6 dias para os serviços preliminares e 19 dias para os serviços de infraestrutura. Ao se comparar os dados coletados em obra com a duração estimada no planejamento, notou-se que na etapa de serviços preliminares apenas a atividade de instalações provisórias, o tempo de duração não seguiu o planejado. Enquanto para a etapa de infraestrutura, as atividades de concretagem do piso juntamente com a malha, aterro, reaterro e escavação, que o tempo execução foi maior que o tempo previsto. Apesar disso, algumas atividades foram executadas em um tempo inferior ao planejado, o que compensou o atraso das outras atividades e não acarretou atrasos à obra. Esse estudo foi importante pois foi o primeiro planejamento realizado para uma obra da empresa e, portanto, os dados obtidos poderão ser utilizados para obras futuras da empresa.
dc.description.abstract2This paper compares, for a single-family high-standard residence, the duration time planned for the activities with the execution time of the work. This comparison was made in the initial stages of the work: preliminary services and infrastructure. For this, the Microsoft Ms-Project software was used, in which the Project Analytical Structure (PAS) was prepared and the estimated durations for each activity were calculated. Simultaneously the Gantt chart was elaborated by means of the software, making it possible to visualize the beginning and end of each activity. Besides this, the duration of the activities was collected in loco for comparison with what was planned and for the company's future acquis. In the planning, the duration of each stage was estimated, being 6 days for the preliminary services and 19 days for the infrastructure services. When comparing the data collected on site with the duration estimated in the planning it was noted that in the preliminary services stage only the provisional installations activity did not last as planned. While for the infrastructure stage, the activities of concreting the floor along with the mesh, backfill, backfill and excavation, the execution time was longer than the planned time. Despite this, some activities were performed in a shorter time than planned, which compensated for the delay of the other activities and did not cause delays to the work. This study was important because it was the first planning carried out for a work of the company and, therefore, the data obtained can be used for future works of the company.
dc.description.physical40 f.
dc.format.mimetypepdf
dc.identifier.bibliographicCitationDURAND FILHO, Cleto Rodrigues. Comparação entre o planejado e executado nas etapas iniciais de uma obra. 2021. 40 f. Trabalho de Conclusão de Curso (Graduação em Engenharia Civil), Centro Multidisciplinar de Pau dos Ferros, Universidade Federal Rural do Semi-Árido, Pau dos Ferros, 2021.
dc.identifier.urihttps://repositorio.ufersa.edu.br/handle/prefix/11683
dc.language.isopt_BR
dc.publisher.centerCentro Multidisciplinar de Pau dos Ferros - CMPF
dc.publisher.countryBrasil
dc.publisher.initialsUFERSA
dc.publisher.institutionUniversidade Federal Rural do Semi-Árido
dc.rightsinfo:eu-repo/semantics/openAccessen
dc.rights.holderUFERSA
dc.rights.urihttp://creativecommons.org/licenses/by-sa/3.0/br/
dc.subject.cnpqENGENHARIAS::ENGENHARIA CIVIL
dc.subject.keywordPlanejamento de obra
dc.subject.keywordDuração de atividades
dc.subject.keywordExecução
dc.titleComparação entre o planejado e executado nas etapas iniciais de uma obra
dc.typeinfo:eu-repo/semantics/bachelorThesis

Arquivos

Pacote original

Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
CeltoRDF_MONO.pdf
Tamanho:
2 MB
Formato:
Adobe Portable Document Format

Licença do pacote

Agora exibindo 1 - 1 de 1
Carregando...
Imagem de Miniatura
Nome:
license.txt
Tamanho:
1,58 KB
Formato:
Item-specific license agreed upon to submission
Descrição: